Customization: | Available |
---|---|
After-sales Service: | Yes |
Warranty: | 5 Years |
Still deciding? Get samples of US$ 15.2/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product name | High Power Copper Skiving Fin Heat Sink for Cooling System Plate Custom |
Material | Copper |
Thickness | Customized |
Tolerance | ±0.01mm |
Surface treatment | Mill Finish,Magnetic Grinding |
Production Process | Cutting, water cleaning, friction welding,CNC Machining,Pressure testing, cleaning |
Raw Materials Cutting Process
CNC Machining ,Punching ,Tapping ,Surface Cleaning Packaging
Company's excellent technical research and development team can carry out radiator design, simulation, thermal resistance die
1. Are you a manufacturer or a trading company?
We are a professional manufacturer from Shandong China,we have more than 15 years' experience in designing and manufacturing heatsinks.The company covers an area of 18000 square meters,has fixed assets of over 60 million yuan,has more than 100 employees,15 technical and quality control engineers.
2.what products can you buy from us?
Aluminum Profile heat sinks, Slotted heat sinks,Water-cooled heat sinks,Embbed heat pipe heat sinks, Shovel tooth heat sinks,and other heat sinks as customers' request.
3. how can we guarantee quality?
(1) Material Inspection - Check material surfaces and approximate dimensions.
(2) First inspection of production - ensure critical dimensions in mass production.
(3) Sampling inspection - check the quality before delivery to the warehouse.
(4) Mass production inspection - 100% inspection by QC assistant before shipment.
4.When will you deliver the goods?
In 20- 30 days after payment. It also depends on the quantity and whether you need mould.
5. What is your terms of payment ?
30% in advance,balance of payment before delivery.For regular customers,the terms can be negotiated.